Not a day goes by where our team of engineers aren’t working up something new! Fabco Industries is proud to introduce the next evolution of our Connector Pipe Screen filter, the Flowline CPS: a new outlet protection screen and stormwater filter designed to capture trash and debris in curved bottom channel catch basins.
Built for performance and practical fit, the Flowline CPS is specifically designed for catch basins with curved bottom channels, installing directly within the channel itself. By conforming to the existing geometry of the structure, the unit intercepts floatable trash, debris and sediment right at the outlet delivering effective treatment without compromising flow rates.
What truly sets the Flowline CPS apart is its ease of use. Utilizing Fabco’s proven expanding ring technology, the unit installs quickly inside existing catch basin outlets, requiring no special tools or complex modifications. Once in place, it stays secure, even under challenging flow conditions. Maintenance crews will appreciate the straightforward access and clean-out, reducing time in the structure and keeping crews safer and more productive.
Designed with durability in mind, the Flowline CPS is constructed with 300 series stainless steel to withstand harsh environments while delivering consistent performance. Whether used as part of a retrofit program or specified for new construction, it offers municipalities and engineers a practical way to enhance stormwater quality and meet regulatory goals.
With the Flowline CPS, Fabco Industries continues our commitment to smart stormwater solutions, and we’ll continue to innovate as long as there’s problems to be solved!
Choosing the right stormwater solution isn’t just about initial cost. It’s about reliability, environmental responsibility, and long-term value! Fabco’s metal inserts deliver all three.
Our range of cost-effective, durable products are designed to meet increasingly stringent pollution control regulations and best management practices for municipal and commercial stormwater markets.
We offer sustainable, simple-to-maintain filtration solutions to meet virtually any stormwater pollution control challenge. Innovative technology. Proven performance. Unbeatable quality and value.
For more information on how Fabco products can help with your project, reach out to our nationwide distributor, Ferguson Waterworks or reach out to us directly at sales@fabco-industries.com!